Jump to content

Brentford happenings?


WJM

Featured Posts

The bit by the services is a temporary tow path diversion as the people building the flats are doing something on that bit of the path, its added a bit more adventure to getting in and out of my mooring, but I dont tend to use the pump out machine because it's rubbish.

 

Whilst I cant quite remember what the plans are for the warehouses, I seem to recall that they are listed but have permission to turn them into some public space, I think a foot bridge is going across there as well...

 

What with the town redevekopment starting soon Brentford is fast becoming the ideal place if you like cranes, diggers and pillings shacking teeth out for 12 hours a day.....

Link to comment
Share on other sites

  • 6 months later...

There are now two 'workings' built out into the canal at Brentford Basin. I am curious to understand what they are. The bank has been dug up and steel pilings driven down into the canal at both places. There are pumps running but after months of this nothing seems to have been built. Does anyone know what the purpose? Water extraction?

Link to comment
Share on other sites

There are now two 'workings' built out into the canal at Brentford Basin. I am curious to understand what they are. The bank has been dug up and steel pilings driven down into the canal at both places. There are pumps running but after months of this nothing seems to have been built. Does anyone know what the purpose? Water extraction?

We can't work it out either, it looks as if they have reclaimed some land but I can't think why, I will nip over me take some pics in a bit.

 

The really annoying thing is that the pumps run 24 hours a day, really noisy. When people move in, I bet they complain about boat noise...

Link to comment
Share on other sites

So, for those that are not from round here or have yet to explore, Brentford is under siege from the developers, they have turned our industrial ditch into waterside property alongside the homogenised world in which we seem to live. Here is the yet to be finished latest effort..

 

BsnBfl6.jpg

 

As part of the process they have dug up some of the tow path in two places, giving us wobbly diversions as a temporary measure. Here..

 

WDN9823.jpg

 

The confusing bit is why? They seem to have put in a double row of pilling with a pump running 24/7. Here..

TDyFT5g.jpg

 

And here..

SQR2jTl.jpg

 

And here..

HgVjCEv.jpg

 

Looking at it logically, I wonder if they have rebuilt that part of the bank after works and needed to section it off for the repair?

 

Any clues?

 

As you can imagine living here has been a challenge, the noise is constant at moment and we have lost an hour of sun. We are current looking to escape..

 

On the other hand, I quite like what they have done with the wharfs so far..

 

5kWk6Cp.jpg

Link to comment
Share on other sites

At present the visitor moorings are down by about 200ft I reckon, that includes the new canoe platform. It looks temp and to be honest, it's so noisy I'd sooner tie up outside the fox and get the bus down. (Or stay in the fox..)

There is still quiet often space though..

Link to comment
Share on other sites

I think I prefer that new woodwork to the post industrial rusting. Let's just hope the new neighbours don't want to purge the canal of boats. There's plenty of mooring in that pound still.

Edited by oarfish
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.