hi all. i have recently changed leisure batteries to the 6v trojan t105s. now in the process of installing 1kw of solar, the controllers  and breakers are in place and wired into the batteries but the panels arent due untill friday. would there be an issue of turning on the controllers before the panels are in place and wired up..

 

thanks all

Link to comment
Share on other sites

3 minutes ago, johnbullsbum said:

hi all. i have recently changed leisure batteries to the 6v trojan t105s. now in the process of installing 1kw of solar, the controllers  and breakers are in place and wired into the batteries but the panels arent due untill friday. would there be an issue of turning on the controllers before the panels are in place and wired up..

 

thanks all

Probably not.  Most controller instructions state you should connect the batteries before you connect the panels - what do yours say?

 

Your controller will just think it is dark outside until you add the panels and you will be able to set up the voltages for bulk/float/equalise in advance.

Link to comment
Share on other sites

1 minute ago, Jess-- said:

no issue that I can think of

if it was the other way around (panels but no batteries) you could do damage.

Recommended to put an isolator switch on the panel side so you easily switch off the panels if you need to .

Edited by Robbo
Link to comment
Share on other sites

Just now, TheBiscuits said:

Probably not.  Most controller instructions state you should connect the batteries before you connect the panels - what do yours say?

 

Your controller will just think it is dark outside until you add the panels and you will be able to set up the voltages for bulk/float/equalise in advance.

instructions say to connect batteries first so i may just switch it on and see what happens

Link to comment
Share on other sites

9 hours ago, johnbullsbum said:

hi all. i have recently changed leisure batteries to the 6v trojan t105s. now in the process of installing 1kw of solar, the controllers  and breakers are in place and wired into the batteries but the panels arent due untill friday. would there be an issue of turning on the controllers before the panels are in place and wired up..

 

thanks all

Why the rush? Turning on the controllers is done by connecting the battery wires, then connecting the panel wires. Why not get it all set up for connecting, fit the panels, including some kind of panel isolation switch, then connect it all up.

Link to comment
Share on other sites

  • 1 month later...

Needing help with my electrics and solar pannels.

 

Recently brought a project boat, 43ft dutch barge, the elctrics are completley buggered, it does have 3 solar pannels, but I'm looking for some help in installing the rest.

I'm looking to live aboard so anyone withing the Hillingdon borough would be great.

 

Many Thanks 

 

Link to comment
Share on other sites

1 hour ago, Anna-Claire said:

Needing help with my electrics and solar pannels.

 

Recently brought a project boat, 43ft dutch barge, the elctrics are completley buggered, it does have 3 solar pannels, but I'm looking for some help in installing the rest.

I'm looking to live aboard so anyone withing the Hillingdon borough would be great.

 

Many Thanks 

 

You might want to create another thread.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.