1 hour ago, JoeC said:

August update on the CRT Toddbrook website (Restoring Toddbrook Reservoir | What's happening in the North West) :

 

'All water from Toddbrook, that feeds the reservoir and gives it its name, is now flowing into the main reservoir, and this will eventually provide a regular flow down the spillway channel to create an attractive, stepped waterfall feature through the town’s Memorial Park.'.

 

 

Also from the same site:

From early next year,  the reservoir will be allowed to refill naturally in carefully monitored stages. Work will start to create a replacement Sailing Club, the construction site will be reduced and artwork applied to the new concrete turrets.

By the summer, Toddbrook Reservoir should again be capable of performing its vital role of supplying water to the Macclesfield and Peak Forest canals

 

which rather contradicts the previous quote. Unless it's such a trickle it really is irrelevant. And, obviously, the Sailing Club, the artwork and an attractive waterfall will no doubt take precedence over filling the canal.

However, we can take comfort in knowing that there will be plenty of water in time for next year's winter stoppages at the next Bollington breach and  Bosley lock repairs.

 

#27
On 01/09/2025 at 01:40, TunnelTiger said:

 

No, I don't believe a safety problem with a dam would be "dismissed and ignored". But it wasn't about a "bod in a cottage" doing any reporting. The issue was that engineer's inspections picked up problems but didn't impose a time scale for remedial work, so it wasn't done. 

Which demonstrates lack of competence in whoever reviewed the report.

#28

I hadn’t appreciated what proportion of CRT’s total engineering budget the reservoir works were eating up - looks like nearly 40%. This would explain why there’s less to spend on actually fixing the canals.

 

If the Todd brook is now flowing into the reservoir again and they need to hold the water level down to raise it in 1m stages, does this mean they’ll be dumping the excess into the canal once they reach the limit?

 

I’m assuming that the Todd brook water has just been dumped into the Goyt for the last few years?

Edited by phantom_iv

#29

Last time I was up there it was being diverted away from the reservoir into the river ... but that may be out of date as its six years later now.

 

Rog

#30
34 minutes ago, phantom_iv said:

If the Todd brook is now flowing into the reservoir again and they need to hold the water level down to raise it in 1m stages, does this mean they’ll be dumping the excess into the canal once they reach the limit?

 

 

You'd certainly hope so!

 

Probably not all of it though - too much water going into the canal can cause a different set of problems compared with too little.  The speed at which it's fed in should be controlled correctly, which is much easier to do if you've actually got some water.

#31
On 05/09/2025 at 12:17, phantom_iv said:

I hadn’t appreciated what proportion of CRT’s total engineering budget the reservoir works were eating up - looks like nearly 40%. This would explain why there’s less to spend on actually fixing the canals.

 

If the Todd brook is now flowing into the reservoir again and they need to hold the water level down to raise it in 1m stages, does this mean they’ll be dumping the excess into the canal once they reach the limit?

 

I’m assuming that the Todd brook water has just been dumped into the Goyt for the last few years?

 

There was a by-pass channel, unless it's been abandoned as part of the current works. So water from the head of the reservoir could be directed to the Goyt.  

On 04/09/2025 at 17:03, jonesthenuke said:

Which demonstrates lack of competence in whoever reviewed the report.

 

No, it doesn't demonstrate lack of competence. The issue was the timescale for carrying out remedial work. Not an easy decision for an organisation with no money. 

  • 1 month later...
  • Site Owner
#32

Bypass channel is staying as I understand it, and has been improved.

 

Presumably this reduced slit build up, rather than allowing it all to flow in and then be released or something, but isnt big enough to cope with flood conditions?

On 30/08/2025 at 18:09, Kingdom Isambard Brunel said:

That may teach them of the false economy of no maintenance ....

 

It is a bit mad that potentially, all of this work was triggered by an event which could potently have been avoided by weeding a regrouting the spillway tiles!

 

Although presumable the new spillway is designed to better cope with our increasingly more extreme climate and surge rainfall?

#33

I had a look on Monday. It looks close to being finished. There's a lot of landscaping going on. No obvious sign that the water level is rising yet. The reservoir floor is covered in Silver Birch saplings.

 

I also had a look at Bosley reservoir. Their was a small amount of water coming in and a similar amount being pumped out to the summit pound. It's still six meters down on normal levels.

#34
On 24/10/2025 at 18:09, Cheshire cat said:

I had a look on Monday. It looks close to being finished. There's a lot of landscaping going on. No obvious sign that the water level is rising yet. The reservoir floor is covered in Silver Birch saplings.

 

I also had a look at Bosley reservoir. Their was a small amount of water coming in and a similar amount being pumped out to the summit pound. It's still six meters down on normal levels.

Yikes! Does it look like they can Open the locks on the 1st Nóvember as projected?

  • 5 weeks later...
#36

Looking at the leave on the trees, that video is at least 3 months old.

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.