Tim Lewis Posted March 23, 2021 Report Share Posted March 23, 2021 CRT have issued the design for the repair/improvement of Todbrook Reservoir, link includes technical and non-technical reports: Restoring Toddbrook Reservoir | What's happening in the North West | Canal & River Trust Link to comment Share on other sites More sharing options...
Ray T Posted March 23, 2021 Report Share Posted March 23, 2021 23rd March 2021 Press release: A permanent repair plan for restoring Toddbrook Reservoir in Whaley Bridge, was announced today by the Canal & River Trust charity (Tuesday 23 March). The Trust, which cares for 2,000 miles of waterways, is planning to build a new side channel weir, ‘tumble bay’, spillway channel and stilling basin on the northern, Sailing Club side of the dam, at an estimated cost of between £12 - £16 million. The auxiliary spillway, damaged in summer 2019, will be de-commissioned and the dam slope grassed. Subject to planning permission, work is likely to start at the end of 2021 and take around two years to complete. The reservoir, which supplies water to the Peak Forest and Macclesfield canals, has been out of action and near empty of water since the spillway was damaged. Ahead of the permanent repair, the Trust, and its contractors Kier, have carried out a major project to make safe the damaged spillway and add a protective waterproof nib to the dam crest. The long-term repair design was informed by feedback from residents who took part in the public consultation last September, when two different options were put forward from an initial 13 potential proposals which had been considered by the design team. Working with specialist engineering design consultants Arup, the Trust’s project team has carried out extensive technical investigations and design work, listened to all feedback and tried to accommodate the best engineering option within the landscape. They continue to develop the details of their proposals to ensure the most effective design solution is adopted. A second public consultation into the proposed plan will be organised for later in the spring, probably online, in advance of a planning application to High Peak Borough Council this summer. Daniel Greenhalgh, Canal & River Trust North West Director, said: “Repairing the reservoir is a huge engineering challenge and public safety is our top priority. The permanent repair design has been shaped by local feedback and guided by modern engineering best practice. “The new spillway will unfortunately require the relocation of the Sailing Club’s clubhouse and slipway. We appreciate this will have a substantial impact on the club but we are committed to working with them to ensure we provide suitable replacement buildings, boat storage and slipway to support their continued use and enjoyment of the reservoir once the project is complete. “The proposed work will also require some changes to the northern area of the park. The play area will have to be re-positioned, and we will carry out landscaping works to ensure that when finished, the park remains an enjoyable and open public space. We are working to develop our plans to ensure this happens as sensitively as possible. “During the construction phase, part of the park will unfortunately have to be closed, but we hope to be able to move some of the play equipment to an alternative location so it can continue to be available. “These changes are necessary to construct the new side channel weir, ‘tumble bay’, spillway channel and stilling basin in an optimum alignment, both within the landscape and for reservoir safety. The stilling basin will then connect with the River Goyt, at the existing location, via a channel through the park. “The use of a side channel weir allows us to connect the existing reservoir bywash into the top of the tumble bay, which will mean water flows down the spillway at all times. We were guided in this design modification by public feedback indicating that a continuous flow of water down the spillway was preferable to having a predominantly dry channel.” The construction project on the dam will be followed by works to the inlet cascade, at the far end of the reservoir, to increase its resilience to high flows from the Todd Brook stream. Subject to planning permission, the Canal & River Trust is hoping to start work on site at the end 2021 and for the reservoir to be re-opened to the public in early 2024. High volume pumps will remain in the reservoir to manage water levels until the end of the restoration project. To view more detailed information about the repair plans, please go to the Canal & River Trust website: https://canalrivertrust.org.uk/restoring-toddbrook-reservoir. ENDS Notes to Editors: The Canal & River Trust cares for and brings to life 2,000 miles of canals and rivers across England & Wales. We believe waterways have the power to make a difference to people’s lives and that spending time by water can make us all healthier and happier. By bringing communities together to make a difference to their local waterway, we are creating places and spaces that can be used and enjoyed by everyone, every day www.canalrivertrust.org.uk. For further media requests please contact: Lynn Pegler m 07783 686246 e lynn.pegler@canalrivertrust.org.uk Link to comment Share on other sites More sharing options...
Athy Posted March 23, 2021 Report Share Posted March 23, 2021 Thanks for this report. Another member has started a very similar thread on the same topic, so this one is now locked. Link to comment Share on other sites More sharing options...
TheBiscuits Posted March 23, 2021 Report Share Posted March 23, 2021 3 hours ago, Ray T said: The Trust, which cares for 2,000 miles of waterways, is planning to build a new side channel weir, ‘tumble bay’, spillway channel and stilling basin on the northern, Sailing Club side of the dam, at an estimated cost of between £12 - £16 million. That's all boat licence income for 2020/2021 spoken for then. It's usually around £20 million, but will be lower this year because of the "free" month / discounts given to licence holders. I hope there's extra funding coming in from elsewhere for Toddbrook or there;s going to be a lot less in the kitty for the next few years. Link to comment Share on other sites More sharing options...
Jen-in-Wellies Posted March 23, 2021 Report Share Posted March 23, 2021 (edited) 1 hour ago, TheBiscuits said: I hope there's extra funding coming in from elsewhere for Toddbrook or there;s going to be a lot less in the kitty for the next few years. The Director and senior management bonuses will have to go obviou..... What am I saying!? ? Edited March 23, 2021 by Jen-in-Wellies 1 Link to comment Share on other sites More sharing options...
matty40s Posted March 23, 2021 Report Share Posted March 23, 2021 2 hours ago, TheBiscuits said: I hope there's extra funding coming in from elsewhere for Toddbrook or there;s going to be a lot less in the kitty for the next few years. I do seem to remember Boris coming out with a moneys no object comment when he was wearing his reflective jacket and helmet in Whailey Bridge. 1 Link to comment Share on other sites More sharing options...
Popular Post Jen-in-Wellies Posted March 23, 2021 Popular Post Report Share Posted March 23, 2021 2 hours ago, matty40s said: I do seem to remember Boris coming out with a moneys no object comment when he was wearing his reflective jacket and helmet in Whailey Bridge. A comment made while wearing hi-vis is regarded by all as binding. Even Boris wouldn't go back on that. It isn't like a manifesto, or marriage vows, or something written on the side of a bus. 2 3 Link to comment Share on other sites More sharing options...
Jen-in-Wellies Posted March 24, 2021 Report Share Posted March 24, 2021 Silly thought. The sailing club that uses Todbrook Reservoir. CaRT own and (don't) maintain the reservoir. Do their sailing dinghies need CaRT licenses? If so, do they just pay the cheaper one for disconnected waterways, like boats on the Monmouth & Brecon? One could argue that it is connected to the Peak Forest Canal, if they were willing to surf the spillway, but that only ran when the reservoir was full. Is the new "always running " spillway design just a way to get the sailors to pay full license fees? Are they getting an extra discount now with there being no water in there? Link to comment Share on other sites More sharing options...
David Mack Posted March 24, 2021 Report Share Posted March 24, 2021 And does my CRT licence entitle me to boat on the Trust's reservoirs? Link to comment Share on other sites More sharing options...
Jen-in-Wellies Posted March 24, 2021 Report Share Posted March 24, 2021 11 hours ago, David Mack said: And does my CRT licence entitle me to boat on the Trust's reservoirs? Perhaps that is how the spillway got damaged in the first place? Someone dragged their narrowboat up it to get their monies worth cruising the reservoir. 1 Link to comment Share on other sites More sharing options...
billh Posted March 24, 2021 Report Share Posted March 24, 2021 I see the sailing club will get a new clubhouse, good for them. They got a new clubhouse less than 12 months before the reservoir debacle, there was an opening ceremony attended by a visiting senior Royal.? Link to comment Share on other sites More sharing options...
Featured Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now