not sure about the draft would it help to and some more ballest maybe sand ?
it list to the side as the toilet tank fills
re the problems lnb sorted most of it out but still requires a repaint they fitted it with an inverter control panel c/heating and a pump out toilet
they are also leaving there fitter with me to install the heating and plumbing (they are providing all the pipework and fittings includind pumps) i just have to get boiler, shower sinks and clarafiore etc
lees have now compleated my boat and are returning it to my yard on wednesday they have repainted it (a few runs) fitted all new windows refitted all joinery and completed the engine also as a good will jesture they have fitted a dis board a 3000w pure sine wave inverter extra batteries battery managment system
a pump out loo and tank and all internal lights and switchs
my boat is now being returned to me from lees narrow boats
they have repaited it (a couple of runs) fitted new windows compleated the engine sorted out all the joinery and done a good job they also fitted me a 3000 pure sine wave inverter distribution board extra batteries and a pump out loo and internall lights free of charge
We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.