Jump to content






5-7th February

Posted by Tom and Bex, 12 February 2011 · 135 views

Managed to finally get the water tank to fit on Friday after cutting away some insulation from under the well deck and using the lowest profile 1/2" fitting I could find for the breather pipe:
Posted Image

Also got a final coat of paint in boatman's cabin including behind weed hatch. Saturday was spent putting coat of grey floor paint on bilges and floor of boatman's cabin:
Posted Image

Then continued with insulation and battens on the cabin sides creating a lot of mess in the process!
Posted Image

By the end of the weekend and with a good tidy up it was looking much better. Insulation and battening was completed on the cabin sides (and insulation only on the roof) from the front back as far as the side hatch including insulating under the gunwales. All exposed metal has been covered - 25mm celotex used and 3mm foam used on any exposed steel angle/box etc. then all joints and 3mm foam covered in foil tape (still some tape left to put on) to provide a complete vapour barrier. Hopefully that lot will keep condensation at bay!
Posted Image
Posted Image

Only got 1 week back at work then a week off so hopefully next update will show quite a bit of progress!

  • 0



have you any photos of the finished product. do you still own diesel & dust. I am previous owner Karen Lightwood please contact me kallight2000@yahoo.co.uk
    • 0
  • Report
have you any photos of the finished product. do you still own diesel & dust. I am previous owner Karen Lightwood please contact me kallight2000@yahoo.co.uk
    • 0
  • Report

September 2014

S M T W T F S
 123456
78910111213
141516171819 20
21222324252627
282930    

Recent Entries

Recent Comments

Categories